- Joined
- May 5, 2005
- Messages
- 4,429
- Reaction score
- 496
Did you get the 5m x 2.5m, is all that wooden base included in the kit apart from the eco base grids?
`Its the severn log cabin 5m x 3m , i went with the 44mm thick logs with double glazing , you get 8 bearers i added the other bits , only because i can get the wood from work.Did you get the 5m x 2.5m, is all that wooden base included in the kit apart from the eco base grids?
That is a good price and you saved by erecting it your self saving £1500/2000 I own my own joinery/sawmill and do the odd bespoke mancave£3500 comes in kit form , spruce wood and only the bearers are treated. I sprayed it with treatment before i painted it
Spot on. That is what ours is costing to be installed and that is mates rates. He has had to dig out loads of earth to get the height to a point where it won’t piss off the neighbors.That is a good price and you saved by erecting it your self saving £1500/2000 I own my own joinery/sawmill and do the odd bespoke mancave
What ever the cabin costs is normally 2/3 labour give or takeSpot on. That is what ours is costing to be installed and that is mates rates. He has had to dig out loads of earth to get the height to a point where it won’t piss off the neighbors.
Looks great TrabbsWe have the same bottle opener and a similar bell
We use essential cookies to make this site work, and optional cookies to enhance your experience.